Saving the Balfour Dock building for future generations!
|
|
|
To view the entire slideshow, click the "Enable/Disable Autoplay" button on the far right. To view individual images, use the "Scroll Forward" and "Scroll Back" buttons to find desired slides, then click on the image numbers to view.
Please reference the following index to view images by content.
|
|
01 – 06 Balfour Dock building before construction, September 2007
07 – 19 Removing the above–water wood flooring, flat truss foundation and wharf
20 – 34 New structural support pillars & metal bracing, removing part of the original pillars
35 – 40 Building a support structure for the front wall (northeast side)
41 – 49 Removing the old boiler room
50 – 53 Installation of ceiling support beams before partial removal of front wall
54 – 59 Initial removal of northeast corner of front wall and 9000 sq. ft. of floor space
60 – 67 Driving waterside piles (17 wharf piles, 90 feet long)
68 – 76 Continuation of removal of front wall and inside floor (lowered 3 feet)
77 – 104 Inside piles — drive pile, smooth edges, add linking ring and new pile, weld, inspect
105 – 116 Building the Pile Cap (1st stage)
117 – 128 Building the footing for the bulkhead — Bulkhead (1st stage); Bulkhead (2nd stage)
129 – 138 Placing concrete — Pile Cap (1st stage)
139 – 146 Deadman Wall construction
147 – 165 Strut construction — rebar cage, concrete form, finished strut, adding fill
166 – 171 At Concrete Tech — building the precast girders (rebar baskets)
172 – 192 Setting precast girders — brought by barge, set by crane
193 – 201 Building forms for Pile Cap (2nd stage), placing concrete
202 – 205 Removing temporary support structures and bracing
206 – 222 At Concrete Tech — casing hollow core panels; setting hollow core panels
223 – 235 Overlay slabs — rebar and forms, placing concrete (with Telebelt) and finishing
236 – 248 Framing new exterior walls
249 – 253 Preparing the interior floor, setting rebar and placing concrete
254 – 296 Finishing work – esplanade, exterior wall, front
297 – 325 Finishing work – interior construction
|
|